Project title:
Cefn Druids FC - 3G Artificial Pitch
Project client:
Jonathan Smith BSc (Hons) MSc CBIOL MIBIOL MCIWEM ,
N/A,
N/A
Quote:
"It was a pleasure to work with Inscapes on the Cefn Druids 3G pitch project, Inscapes responded quickly when tendering for the works and established a site presence at short notice. The work was undertaken efficiently and to a high standard. The pitch attained the highest FIFA 2 star accreditation at completion. The work was completed on budget and in line with a demanding programme."
Work undertaken by Greensport Trading Ltd T/A Inscapes:
The team were required to work alongside a consultant on this project – Jonathan Smith, Geoturf consulting. The job involved excavating the existing natural pitch to existing drainage system with new drains having to be installed. It also required the team to strip off the top soil and stock pile at the end of the pitch, grade sub soil to level with a 300mm fall back and 50ml blinding layer of low fines stone dust, install main drain and silt traps then install lateral drains to main drain. The job also involved using the box grader to achieve 3mm tolerance, and roll. Laying 15mm shock pads and fully install 60mm carpet including sand and rubber.
Reason for choosing Greensport Trading Ltd T/A Inscapes:
N/A